| Project Image |
Project Name |
Client |
Scope of Work |
Actual Situation |
In Cooperation With |
 |
Supervision Services for the Construction of Dereköy Intersection –Aziziye – Bulgarian Border State Road
Detail» |
General Directorate of Highways |
Construction Supervision and Engineering Services of 5 km. Expressway
(Funded by EIB) |
On going work End of project: 2010 |
- |
 |
Ankara-Pozanti Motorway Ciftehan-Pozanti Section Construction Supervision and Engineering Consulting Services
Detail» |
General Directorate of Highways |
TRANS-EUROPEAN MOTORWAY PROJECT
Construction Supervision of 18.5 km of (2x3) Motorway |
On going work End of project: 2010 |
- |
 |
Sirnak-Pervari Separation - Catak-Begendik Separation, State Highway |
General Directorate of Highways |
Feasibility study, Final Design and Engineering Services of 24 km State Highway |
Completed in 2008 |
- |
 |
Ankara-Cankiri Seperation-7th Division- Iskilip State Highway Project; Preliminary and Final Design Engineering Services
Detail» |
General Directorate of Highways |
Preliminary and Final Design of the (2x1) state highway (84 km) |
Completed in 2008 |
- |
 |
Diyarbakır – Silvan Seperation - Bingöl; Preliminary and Final Design Engineering Services |
General Directorate of Highways |
Preliminary and Final Design of the (65 km.) Expressway |
Completed in 2008 |
- |
 |
Cumaovası Torbalı Railway
Final Design And Engineering Services |
Turkish State Railways,
3th District Directorate |
Final Design And Engineering Services for 27.3 km railway |
Completed in 2008 |
- |
 |
The Preparation of Detailed Design and Bidding Documents for the Upgrading of a 24 km. Section of the E-60 Highway between Igoeti and Sveneti
Detail» |
Ministry of Economic Development of Georgia (MOED) |
The Preparation of Detailed Design and Bidding Documents for the Upgrading of a 24 km. Section
(Funded by World Bank) |
Completed in 2008 |
INOCSA Ingenieria, S.L. |
 |
Final Excavation, Subgrade Preparation and Construction of Foundation and Superstructure for Central Reference Lab. with Water Storage Tanks in Tbilisi, Georgia |
BECHTEL INTERNATIONAL SYSTEMS, INC. |
Final Excavation, Subgrade Preparation and Construction of Foundation and Superstructure |
On going work End of project: 2008 |
VONA International Trade & Construction Inc. |
 |
Gaziantep – Şanlıurfa Motorway Project; Preliminary and Final Design Engineering Services
Detail» |
General Directorate of Highways |
Preliminary and Final Design of the (15 km.) Motorway |
On going work End of project: 2008 |
- |
 |
Halkalı – Bulgaria Railway |
General Directorate of Railways, Harbors and Airports Construction (DLH) |
Design and Engineering Services For Dual Line 303 km Railway |
On going work End of project: 2008 |
MEGA - AKSA Engineering Inc. |
 |
Tekirdağ – Muratli – Büyük Kariştiran Railway, Turkey |
General Directorate of Railways, Harbors and Airports Construction (DLH) |
Design and Engineering Services For Dual Line 50 km Railway |
Completed in 2007 |
MEGA - AKSA Engineering Inc. |
 |
Reconstruction of Roads in Düzce, Çilimli, Gölyaka, Cumayeri, Kaynaşlı, Gümüşova, Yığılca, Beyköy, Konuralp, Boğaziçi and Akçakoca |
Düzce Municipality |
Construction Supervision and Engineering Services for 100 km city roads
(Funded by EIB) |
Completed in 2006 |
- |
 |
Istanbul-Bursa-Balikesir-Izmir Motorway Orhangazi-Bursa Section Preliminary and Final Design Engineering Services
Detail» |
General Directorate of Highways |
TRANS-EUROPEAN MOTORWAY PROJECT
Preliminary and Final Design Engineering Services to include geodetical and geotechnical surveys
(34 km) |
Completed in 2006 |
- |
 |
Reconstruction of Urban Roads in Duzce and Golyaka Cities, Turkey
Detail» |
Düzce Municipality |
Design, Construction Supervision and Engineering Services for 20 km city roads
(Funded by EIB) |
Completed in 2005 |
- |
 |
Ceyhan-Yumurtalık State Highway Study, Final Design and Engineering Services Work
Detail» |
General Directorate of Highways |
Preliminary and Final Design of the (2x2) state highway (27 km) |
Completed in 2005 |
- |
 |
Pozanti-Tarsus-Mersin Motorway Design and Construction Supervision and Engineering Services
Detail» |
General Directorate of Highways |
TRANS-EUROPEAN MOTORWAY PROJECT
Construction Supervision and Engineering Services of motorway (149 km) |
Completed in 2005 |
- |
 |
Eskisehir-City Crossing (Elevated Interchanges) Preliminary and Final Design Engineering Services
Detail» |
General Directorate of Highways |
Preliminary and Final Design of 2 interchanges and connecting (2x3) roads to include geodetical surveys |
Completed in 2003 |
- |
 |
Iskenderun-Antakya Cilvegozu Motorway Preliminary Design and Engineering Services
Detail» |
General Directorate of Highways |
TRANS-EUROPEAN MOTORWAY PROJECT
Preliminary Design of Engineering Services including Geodetical and Geotechnical works
(80 km) |
Completed in 1999 |
- |
 |
Dardanelles Suspension Bridge Highway Crossing Feasibility Study, Preliminary and Final Engineering Services with (2x3) motorway
(20 km)
Detail» |
General Directorate of Highways 17th Division |
a) Feasibility Study
b) Preliminary and Final Design of Dardanelles Suspended Bridge, approaches and ancillary buildings
c) Tender Documents to include geotechnical and geodetical surveys |
Completed in 1998 |
Brown Beech & Associates , London |
 |
Edirne Kinali Motorway Project (including connection roads)
Edirne – Kinali,
Turkey 1987
Detail» |
General Directorate of Highways 17th Division |
TRANS-EUROPEAN MOTORWAY PROJECT
Preliminary and Final Design of Motorway (150 km) and connection highways (60 km) including mapping and geotechnical works |
Completed in 1996 |
Ove Arup International, London |
 |
Umraniye Expressway Project Istanbul, Turkey-1989 |
General Directorate of Highways 17th Division |
Final Design and Supervision Services for the Umraniye Expressway, between the first and second Peripheral Highways of Istanbul (14 km) |
Completed in 1996 |
Freeman Fox & Partners, London |
 |
Istanbul 2. Peripheral Motorway and Suspension Bridge, Preliminary and Final Design and Construction Supervision Engineering Services
Detail» |
General Directorate of Highways 17th Division |
TRANS-EUROPEAN MOTORWAY PROJECT
Feasibility, Preliminary and Final Design, Preparation of Tender Documents and Construction Supervision to include geotechnical and geotedical surveys
(77.1 km) |
Completed in 1994 |
Freeman Fox & Partners, London |
 |
Bosphorus Cornice Road for European Side and the Coastal Link Drawings Istanbul, Turkey-1986 |
Municipality of Istanbul |
Location study, Preliminary and Final Design of a 2x3 divided road (13 km) |
Completed in 1987 |
- |
 |
Arterial Road Study and Design of Anatolian side of Istanbul Istanbul, Turkey-1985 |
Municipality of Istanbul |
Preliminary and Working Design of Goztepe and Bostancı Streets and Interchanges between Motorway E5 and Bagdat Boulevard
(approximately 30 km) |
Completed in 1986 |
- |
 |
Saudi Arabia Airlines Istanbul Central and Ticket Sales Offices Design, Istanbul, Turkey-1984 |
Saudi Arabian Airlines |
Interior Design and Construction of Management of New Office Center (800 m2) |
Completed in 1985 |
- |
 |
Municipality of Bakirkoy 2 number Railway Over- bridges and rail Transportation Studies Istanbul, Turkey-1984 |
Municipality of Bakırkoy |
Location study, Preliminary and Final Design, Preparation of Tender Doc., Transparent. Study Establishing New Road
Arteries and Bus Routes |
Completed in 1985 |
- |
 |
Rehabilitation Project for Sirkeci-Halkali, Haydarpasa-Gebze Railway Istanbul, Turkey-1983 |
Ministry of Public Works, General Directorate of Railways |
Increasing the Existing 2 tracks to 4 Rehabilitation of the vertical and horizontal alignment of the railway Preliminary and Final Design of railway (73 km) |
Completed in 1985 |
- |
 |
Design for Sewer Treatment of the City "Manisa" Manisa, Turkey-1983 |
Bank of Counties of the Ministry of Public Work |
Preliminary and Final Design of the sewage treatment plant for a population of 282,472 |
Completed in 1985 |
- |
 |
Sewage Treatment and Sea Discharge of the City "Urla" Izmir, Turkey-1983 |
Bank of Counties of the Ministry of Public Work |
Preliminary and Final Design of the sewage treatment plant for a population of 83,000 |
Completed in 1984 |
- |
 |
Rehabilitation Project for 1981-1982 East-West Fuel Pipeline. 15 different locations, Turkey-1983 |
Ministry of National Defense |
Site Investigation, Final Design, Tender Documents and Construction Supervision |
Completed in 1984 |
- |
 |
Feasibility Study of the Bosphorus Railroad Crossing, Istanbul,Turkey-1982 |
Ministry of Public Work, General Directorate of Railways |
Consultancy Services for the Feasibility Study and Preliminary Design of rail tunnel develop across the Bosphorus |
Completed in 1984 |
De Leuw Cather International, USA |
 |
Design for Sewer and Treatment Facilities of the City "Soke" Aydın, Turkey 1982 |
Bank of Counties of the Ministry of Public Works |
Preliminary and Final Design of the sewage treatment plan for a population of 101,000 |
Completed in 1984 |
- |
 |
Pre-Treatment, Pumping and Discharge Bandirma, Turkey-1982 |
Bank of Counties of the Ministry of Public Works |
Preliminary and Final Design of the sewage treatment plan for a population of 153,052 |
Completed in 1983 |
- |
 |
Final Design of the 90 km Portion of Thracian Motorway (Mahmutbey- Kinali) Istanbul-1978 |
General Directorate of Highways 1st Division |
Preliminary and Final design of Motorway to include mapping and geotechnical engineering |
Completed in 1982 |
Freeman Fox & Partners, London |
 |
Second Bosphorus Highway And Railroad Crossing Istanbul -1976 |
General Directorate of Highways 17th Division |
Underwater Crossing For Motorway And Railway; Feasibility Study And Preliminary Design For The Second Bosphorus Bridge And 40 Km. Access Roads |
Completed in 1980 |
Freeman Fox & Partners, London |
 |
Feasibility Study for Istanbul Subway Istanbul, Turkey-1977 |
General Directorate of Highways 17th Division |
Transportation study and Preliminary Design for rail, tunnels, bridges, stations and electro-mechanical systems (15 km) |
Completed in 1979 |
Freeman Fox & Partners, London |
 |
Electricity Company Building of Riyadh Saudi Arabia-1978 |
Ministry of Electricity of Saudi Arabia |
Structural Design |
Completed in 1979 |
- |
 |
Al Jouf Library Building Saudi Arabia-1978 |
Ministry of Culture of S. Arabian King |
Structural Design |
Completed in 1979 |
- |
 |
Feasibility Study for Dardanelles Road Crossing Dardanelles, Turkey-1977 |
General Directorate of Highways |
Feasibility and Final Design study of Bridge Crossing and approach roads |
Completed in 1978 |
Freeman Fox & Partners, London |
 |
Consultancy Services First Bosphorus Suspended Bridge Istanbul, Turkey-1975 |
General Directorate of Highways 17th Division |
Consultancy services for the operation and maintenance Bosphorus Bridge |
Completed in 1978 |
Freeman Fox & Partners, London |
 |
Maintenance and Administration Facilities for Directorate of Highways |
General Directorate of Highways 17th Division |
Preliminary and Final Architectural and Structural Design |
Completed in 1977 |
- |
 |
General Directorate of Highways 1st Division Tutunciftik Administration And Service Areas And, Residential Buildings Preliminary Design Gebze,1976 |
General Directorate of Highways 1st Division |
Inner Roads And Motorway Connection Roads (Having A Total Area Of 1,200.00M2 )
, Exchanger Final Designs |
Completed in 1977 |
- |
 |
Preparation of Tender Documents for the Anatolian Motorway Izmit, Turkey-1976 |
General Directorate of Highways 1st Division |
Preparation of Tender Documents, both Turkish and English versions |
Completed in 1977 |
- |