POZANTI- TARSUS – MERSİN – MOTORWAY DESIGN AND CONSTRUCTION SUPERVISION AND ENGINEERING SERVICES
Project Description
Pozantı – Tarsus – Mersin Motorway is the major and comprehensive part of the Trans-European Motorway which is located at the Mediterranean region of Turkey and it is also one of the most important roads which connects Middle East, South and South Eastern Anatolia. This motorway contributes great amounts to development and improvement of these mostly agricultural region and exportation of their production. For this reason, during the feasibility studies and planning stage, these vital subjects have taken into consideration for the economy, tourism and transportation sectors of Turkey.
In the scope of this project, BOTEK has also made an urban planning for Mersin city which has one of the most active and significant harbours in Turkey. Within the planning project, approximately 40 km long city roads and their motorway connections were designed and supervised including all drainage works, settlement and structure plans, landscape works, earthworks and traffic census and study.
In addition, BOTEK has provided supervision services for 700,000 m2 of park area which is known as the most significant and extensive projects one in Turkey. It comprises administrative buildings, public buildings, parks, restaurants, shops, petrol stations, toilets and all electrical and mechanical installations related with these facilities
Besides motorway works, BOTEK was also responsible for following activities:
Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, tunnels, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
Emergency communications system works include phones, cabling, power source, posts and other works and spares
Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations
Arrangement and planning of side roads and facilities located alongside of the motorway
Supervision Services of this Trans-European Motorway (TEM) project have been carried out in three stages:
1. Pozantı – Tarsus Motorway, Section I.
(15.266 km)
This Motorway Section starts at Tekir Hill of Pozantı and ends at Çamalan region. At this section, a part of road infrastructure and some of the structures have previously been constructed by (GDH), General Directorate of Highways.
2. Pozantı – Tarsus Motorway, Section II,
(30.492 km)
The motorway which is constructed between Pozantı and Tarsus, continues as TAG Motorway in Adana – Gaziantep direction towards East and, as Çukurova Motorway in Mersin-Çeşmeli direction towards West.
3. Tarsus Separation, Mersin Motorway
(103.00 km)
Project Summary
Pozantı – Tarsus Motorway, Section I: (2x3), 15.266 km
Pozantı – Tarsus Motorway, Section II: (2x3), 30.492 km
Tarsus – Mersin Motorway: (2x3), 103.000 km
Totally 148.758 km Motorway
6 Viaducts (Total Length of 4381 m)
10 Toll Plazas
1400 m. Long Cut and Cover Tunnel
3 Maintenance Areas
3 Parking Areas
2 Service Areas
41 Over-pass Bridges
23 Under-pass Bridges
16 Interchange Bridges
483 Box Culverts
41 Under-passes
12 Over-passes
Services Provided
Within the scope of Pozantı – Tarsus and Tarsus – Mersin Motorways, there exist;
3 Maintenance and Operating Centres (77,800 m2) each comprising of:
a) Administrative Building (2 Storey)
b) Dormitories and Kitchen (4 Storey)
c) 22x22 (4 Storey) Lodgements
1 Administrative Buildings at each 10 different Toll Plazas
2 Police Stations at 2 different Toll Plazas
3 Parking Areas (185,000 m2) each consisting of toilets, buffets and restaurant buildings
2 Service Stations (367,990 m2) each consisting of petrol stations, restaurants and repair plus maintenance workshops
The grand total of the buildings are approx. 20 000 m2 closed area at a value of nearly EUR 18 Million.
Building Summary:
Supervision of Motorway Construction
Supervision of Viaduct, Bridge & Structure
Constructions
Supervision of Motorway Barriers and Railings
Mountings
Supervision of Construction of Facilities,
Parking and Maintenance Areas, Service
Stations, Toll Plazas, Administrative and Public
Buildings
Supervision of Motorway Landscape Works
Supervision of Pavement and Earthworks
Supervision of Electric and Water Line
Installations
Supervision of Lighting Works
Traffic Census
Traffic Signs and Signalization
Drainage Works
Landscape Studies and Planning
Design Review
Quality Control
Data processing and Documentation
Preparation of Final Accounts and Payment
Certificates
|

 |
|