CEYHAN – YUMURTALIK STATE HIGHWAY STUDY FINAL DESIGN AND ENGINEEERING SERVICES WORK
Project Description
The project included preparation of preliminary and final design of (2x2) state highway approximately 27 km long. The design work has been based on upgrading the highway standards at those sections of the existing Ceyhan – Yumurtalık State Highway which lies south of Turkey. In addition to highway design sections, BOTEK also made improvements to the existing sections on the horizontal and vertical geometric standards.
The design work included the following: Topographical and other field surveys, structural evaluation and design, drainage and hydrological studies and design, soils and materials investigations, pavement evaluation and design, preparation of complete construction plans.
Services Provided
Review of Conceptual Design
Field Surveys
Environmental Impact Assessment Rep.
Design of Hydrological Structures
Final Detailed Design of
Ancillary Structures
Drainage Design
Cross Sections
Earthworks
Bruckner Calculations
Soil Investigation
Traffic Study
Preparation for the Bill of Quantities
Assistance to State Highways Directorate on Tender Procedures
Project Details
11 at-grade interchanges
2 bridges of 4 spans
1 under-bridge
45 hydraulic structures along the project alignment
|
 |
|