SFC - DORTEK INDUSTRIAL BUILDING PROJECTS
Project Description
The purpose of this subcontract is to complete engineering, complete the excavation performed by others, prepare the subgrade, and construct the foundations and the superstructure for the Central Reference Laboratory (CRL) building. Also, review and complete the remaining engineering for the Potable Water Storage Tanks located west of the CRL Building. Upon construction of the foundations and superstructure, and the water tanks, the buildings will be completed and finished for operation by others.
Project Description
SFC - DORTEK Industrial Building Project is a "design-build” project on “turn-key” basis, performed in Kastamonu, Turkey. This Industrial Building is a typical industrial building.
Steel Structured Paint Factory
2 Floors
8.082 m2 in Each
16.164 m2 Total Closed Area
The Building was built on Z3 Class soil in Turkish Local Geotechnical and Seismic Code (TDY98), or SC-SD in UBC 97 (uniform Building Code 97).
Primary and secondary structural system of the Building was designed and built with structural steel on a concrete foundation. The roofing and cladding will be insulated sandwich panel system
Services Provided
Cost Appraisal
Design Check
Construction Supervision
Quality Control
Payment Approval for American EXIM Bank
|



|
|